[Cici Chen & Tien Dao] Week 7: 4/3 – 4/10

This week Tien and I worked together on analyzing the data from our user testing and made the change to our Sketch design.

Goals:
Finished: Analyze user testing data

Finished: Fix display bar, buttons, and slide sets

Started/To be continued: Presentation slides

(The above tasks are revised multiple times during the week, taking up to 8 – 10 hours)

[Cici Chen] Week 6: 3/27 – 4/2

This week Tien and I worked together to get prepared for user testing.
Goals:
Finished: Sketch designs of rooms and floor maps

Finished: 18 questions/tasks for Loop 11

Finished: InVision prototype

(The above tasks are revised multiple times during the week, taking up to 8 – 10 hours)

Started/To be continued: Complete the Loop 11 test and send to our list of users

Summary for this week: The major goal for this week is completing the Sketch designs, turning them into workable prototypes on InVision and starting Loop11 test.

[Cici Chen] Week 5: 3/19-3/26

The major goal for this week is focusing on analyzing and re-designing wireframes and working on the prototype.

Goals:
Finished: Created second persona on Sketch (Sara) and got access to Sketch

Finished: Created low-fidelity wireframes on Balsamiq and discuss with Dawn

Finished: Refined the low-fidelity wireframes on Balsamiq (filter bar and display bar)

Finished: Collect icon for top 5 resources and wheelchair

Started/To be continued: Design prototype using Sketch and InVision

Summary for this week: This week, we refine the Balsamiq wireframes and develop the Sketch prototypes accordingly (from Tien).